Find Jobs
Hire Freelancers

Primavera P6 Construction Schedule Update

$10-30 USD

Closed
Posted 15 days ago

$10-30 USD

Paid on delivery
I have a baseline construction schedule built already; it has around 1000 activities, the schedule is cost & resource loaded. I will provide the update in excel (actual start, actual finish, actual cost), the monthly activities that needed to be updated (actual date & Cost) around 100 activities every month. Please note sometimes I need to provide you comments on the schedule update, so you need to fix the comments. I need you to update the start/finish date and insert the actual cost monthly (once every month). Plus, prepare small narrative report including some P6 PdF. I have the P6 layouts I will share with you. I have the report and layout built in already and I will share it with you. Finally, send me XER file, and Narrative report every month. It is very important you respond and communicate quickly. I can share sample I did last month as an example to show you, and you follow the same steps, is very straight forward/ easy.
Project ID: 38073813

About the project

24 proposals
Remote project
Active 8 days ago

Looking to make some money?

Benefits of bidding on Freelancer

Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
24 freelancers are bidding on average $29 USD for this job
User Avatar
I have read and understood all your project details "Primavera P6 Construction Schedule Update" and I feel my self the best candidate to complete this project with 100 percent accuracy. I am Faisal Mahmood, I have more than 10 Years of experience in crafting tailored solutions for success, including; Business Plans, Pitch Decks, Feasibility Reports, Resumes, Cover Letters, and LinkedIn profiles. Over the past ten years, I have consistently delivered exceptional results, helping clients navigate the competitive landscape with precision and finesse. With a proven track record spanning ten years, I bring a wealth of experience to every project, ensuring not just quality but a profound understanding of evolving industry dynamics. My approach is rooted in precision, innovation, and a relentless pursuit of perfection, setting a standard that goes beyond expectations. I am damn sure that you will love my services, try me once at least. I am anxiously waiting for your messages.
$10 USD in 1 day
4.6 (45 reviews)
4.9
4.9
User Avatar
Hi, I have seen your your project details and I am the "BEST CANDIDATE" for this job "Primavera P6 Construction Schedule Update". I am Aisha Mujahid, an experienced professional offering comprehensive writing services tailored to elevate your brand and communications. I have a proven track record and a 99% satisfaction ratio from over 2500 clients, and I am eager to contribute to your project's success. I offer comprehensive services tailored to meet your diverse needs. My services are; Article & Blog Writing, Website Content, Book/eBook Writing, Product Descriptions, Presentations, Resume/CVs, Cover Letters, LinkedIn Profiles, Business Plans, Pitch Deck Presentations, Feasibility Reports, YouTube Scripts, White Papers, and Grant Writing. Let's collaborate to craft compelling narratives that leave a lasting impact. I look forward to enhancing your brand through the power of words.
$10 USD in 1 day
5.0 (17 reviews)
4.3
4.3
User Avatar
I am damn sure that I can complete this project "Primavera P6 Construction Schedule Update" beyond your expectations and within your given time and budget. I am a specialized writer who has been providing professional writing services since 2017 and I have 800+ reviews with 4.8 ratings. In this industry, to produce 100% output the most important thing is the “CREATIVITY” because every time clients demand something “Unique, New & Better”. Since 2017, I have found myself highly creative and this is the main reason for my success because I have achieved the 99% client satisfaction ratio. I have mastered multiple writing skills such as; Investor Ready Business Plans, Pitch Deck Presentations, Financial Models, Feasibility Reports, ATS Resume/CV, Job-winning Cover Letters, Optimized LinkedIn Profiles, White Papers, Grants, Press Releases, Biographies, Speeches, Letters, Website Contents, Articles, Blogs, Book/eBooks, Product Descriptions, and Editing and Proofreading. Please click on the "Award" button to hire me. I am waiting for you, "Thank You"
$10 USD in 1 day
4.8 (7 reviews)
3.9
3.9
User Avatar
Dear Sir , I have over 12 years of experience in planning and cost control in major industrial projects, and I am a professional in developing schedules on Primavera and preparing various project reports such as dashboards in all its forms. I am confident that I have the skills and experience you are looking for. I am proficient in Primavera P6 software, and I have a proven track record of developing accurate and efficient reports . I am also able to meet tight deadlines and deliver high-quality work within a short timeframe. PMP CERTIFIED AND MBA IN PROGRESS
$100 USD in 2 days
4.9 (5 reviews)
4.0
4.0
User Avatar
Primavera P6 Construction Schedule Update My name is Rabia Faisal, I am working in the writing industry since 2011. During this time, I have served countless clients with a full amount of satisfaction by providing them with TOP Quality Solutions. I have command of all references APA, Harvard, IEEE, MLA & Chicago, etc. I will provide plagiarism-free work with 100 percent accurate grammar within your given deadline. Please message me to get Top Class Services. I am waiting; https://www.freelancer.com/u/TopWritingGuru
$10 USD in 1 day
5.0 (3 reviews)
2.2
2.2
User Avatar
Dear Client, I am primavera p6 expert. I have extensive experience in preparing schedules on primavera as well as in resource allocation, cashflow and other reports. Please contact to start work. Regards
$20 USD in 1 day
3.2 (1 review)
2.9
2.9
User Avatar
Hi I am a civil engineer with a Master's degree in construction management, I have more than 17 years of experience in project planning and scheduling using P6 and MS Project. I am a professional user of Primavera P6 and I can update your baseline on a monthly basis as required to actual dates and costs. Also, I can prepare the required narrative report to highlight changes and the updated information. In addition, I will help you to track the progress and to reschedule the work if delays happened. I am committed to delivering high-quality results and am eager to discuss this offer with you and how I can contribute to your project's success. Note: The indicated rate is my hourly rate. Best regards
$20 USD in 3 days
5.0 (1 review)
1.2
1.2
User Avatar
I have been working in the steel construction industry since 2018, starting from the technology department and technologist's duties, I went through all stages of production, starting from quotation, technological preparation, production planning, ordering materials, production control, quality control and settlement of completed projects. I would like to join the first project on this website, I invite you to cooperate.
$25 USD in 7 days
0.0 (0 reviews)
0.0
0.0
User Avatar
Dear Sir I am pleased to work for you on this schedule update . i have Experience as Planning Engineer in UAE. Looking forward for your positive response.
$25 USD in 4 days
0.0 (0 reviews)
0.0
0.0
User Avatar
I am excited to present my proposal for optimizing your project management processes, with a focus on enhancing project scheduling and elevating project report writing to new heights. I excel in crafting bespoke project scheduling strategies tailored to your unique needs. By meticulously planning task timelines and dependencies, we ensure smooth project execution, minimizing delays and maximizing efficiency. In addition to my prowess in project scheduling, i pride myself on my ability to deliver insightful project reports that provide actionable insights and drive informed decision-making. My reports are not just documents; they are strategic assets that empower you to stay ahead of the curve and anticipate potential challenges. By entrusting me with your project management needs, you are partnering with a person dedicated to excellence, innovation, and client satisfaction. Let me streamline your project management processes, so you can focus on what truly matters – achieving your goals. I look forward to the opportunity to collaborate with you and contribute to the success of your projects. Best regards, Ajeigbe iyanu samuel.
$30 USD in 7 days
0.0 (0 reviews)
0.0
0.0
User Avatar
Hi, With 20 years of professional experience and hands on knowledge with Excel, will be able to deliver this task in quicker time & with quality. Client satisfaction is our utmost priority.
$15 USD in 7 days
0.0 (0 reviews)
0.0
0.0
User Avatar
Greetings to you. The fact that my professional experience is 16 years old and running in this exciting construction area as a contractor and construction manager, which, with the intuition of meeting the requirements, guarantees me aspects: * MANAGING, IMPLEMENTING AND INTERVIEWING SMALL AND MEDIUM PROJECTSCIVILIANS AND REMOVALS IN RESIDENTIAL, COMMERCIAL AND INDUSTRIAL BUILDINGS. * Cost-effective and honest assumptions. * ESTIMATE Materials, Time, and Human Resource. * Knowledge and skills in installation techniques of DRYWALL, application of PAINTING, realization Waterproofing, plumbing, lighting and haute dismantling or demolition. * Decide and Select Appropriate Materials. I hope to hear from you.
$20 USD in 7 days
0.0 (0 reviews)
0.0
0.0
User Avatar
I have already prepare the baseline schedule in P6 and update the schedule in monthly basis of our hospital projects. I have already 15 years experience in scheduling, recourse planning, tracking, monitoring progress, maintain project issue tracker and forecasting project status in dashboard.
$25 USD in 7 days
0.0 (0 reviews)
0.0
0.0
User Avatar
Dear, With over 15 years of experience in project planning and scheduling within sectors like Oil & Gas and Pulp, utilizing tools such as P6 and MS Project, I bring a wealth of expertise to this role. I'm adept at managing monthly updates, adeptly adjusting start/finish dates, integrating actual costs, and promptly addressing any comments that arise. Recognizing the significance of providing a narrative report, I will ensure its inclusion with each update. Thank you for considering my candidacy. I eagerly anticipate showcasing my efficiency and precision in this position. Best regards,
$10 USD in 3 days
0.0 (0 reviews)
0.0
0.0
User Avatar
I’m a a civil engineer and Planner with 12 years of experience and I can deliver a high precision work of planning & scheduling and estimating of quantity with Primavera P6, MS Project and MS Excel Below you find the tasks that I am experienced in : Create WBS, OBS, EPS Structures. Estimate project construction costs. Develop time and cost estimates. Establish and update plannings and scheduling in Primavera and also in MS Project. Review the work progress. If you choose me I'm sure that I can do the work properly.
$25 USD in 5 days
0.0 (0 reviews)
0.0
0.0
User Avatar
Hello, I am a planning Engineer Sr. with wide experience using Excel , P6, .....etc. I will provide the monthly update in a few hours max one day. I am doing this work in my company on a weekly bases which makes me the perfect fit for this position
$20 USD in 1 day
0.0 (0 reviews)
0.0
0.0
User Avatar
Dear Sir , I have over 11 years of experience in planning and cost control in major industrial projects, and I am a professional in developing schedules on Primavera and preparing various project reports such as dashboards in all its forms. I am confident that I have the skills and experience you are looking for. I am proficient in Primavera P6 software, and I have a proven track record of developing accurate and efficient reports . I am also able to meet tight deadlines and deliver high-quality work within a short timeframe.
$20 USD in 7 days
0.0 (0 reviews)
0.0
0.0
User Avatar
make Updates in same day and i have enough experience to handle any thing. i can make Baseline and revised also.
$20 USD in 7 days
0.0 (0 reviews)
0.0
0.0
User Avatar
Hello Sir, I like how you descriped the project trying to not leave any questions unanswered but I still have few questions: 1- What do you want to do with the out of sequence activities? as some clients or consultants prefer to leave the relationships unchanged and they only ask to change them if a recovery or revised schedule is required. 2- Are you going to need a recovery or revised schedule any time in the future? if so, it is not included in the current bid. 3- What is the duration of the project? 4- The offered bid is monthly rate. That's it. I am sure my work will meet your expectations and please don't hesitate to contact me for any inquiries or clarifications. Regards.
$120 USD in 2 days
0.0 (0 reviews)
0.0
0.0

About the client

Flag of UNITED STATES
Newark, United States
5.0
11
Payment method verified
Member since Aug 14, 2017

Client Verification

Thanks! We’ve emailed you a link to claim your free credit.
Something went wrong while sending your email. Please try again.
Registered Users Total Jobs Posted
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Loading preview
Permission granted for Geolocation.
Your login session has expired and you have been logged out. Please log in again.